Current Status

Phase: 3 - Implementation Date: 2026-07-17

Completed

  • T01: Auth + User Management + RBAC + Base Frontend + i18n
    • 50 backend tests passed, 16 frontend tests passed
    • Next.js build successful, health endpoint 200
    • Commit: d893048
  • T02: Vehicle Management + mobile.de Push + Vehicle UI (committed, tests pending verification)
  • T04: Contact Management + USt-IdNr. Validation + Contact UI (committed, tests pending verification)
  • i18n fix: 'use client' directive added to i18n.tsx
  • T03: OCR-Erfassung via OpenRouter Vision + OCR UI
    • 33 backend tests passed (85% coverage), 18 frontend tests passed
    • Full backend suite: 229 tests passed
    • Backend: OCRResult model, schemas, OpenRouter client, ocr_service, async task, router
    • Frontend: OCRUpload (drag-and-drop), OCRResults (list), OCRDetail (side-by-side), OCR page
    • OpenRouter Qwen2.5-VL integration with structured JSON output
    • Confidence threshold: < 0.7 → manual_review, >= 0.7 → completed
    • Async processing via FastAPI BackgroundTasks

In Progress

  • None

Blockers

  • None

Notes

  • PostgreSQL test DB (erp_test) and user (erp_test_user) set up locally
  • Next.js 14.2.5 has security vulnerability warning - upgrade recommended later
  • node_modules installed via npm install (294 packages)
  • OPENROUTER_API_KEY added to config.py (empty default, needs env var in production)
  • MAX_FILE_SIZE_MB=50 added to config.py
  • @vitest/coverage-v8 not installed (frontend coverage runs without it)